[Home] [Affiliations] [Diagnostics] [Facilities] [Gallery] [Personnel] [Publications] [Research] [Thrusters]

 

Image

Description

Argon-ion Pumped Coherent Dye Laser

Laser diagnostics at PEPL

Hydrogen_Arcjet.gif (22182 bytes)

1 kW Hydrogen Arcjet on Thrust Stand

mpd_plume.jpg (11217 bytes)

Quasi-steady MPD Thruster

LGIT04.jpg (28528 bytes)

The Linear Gridless Ion Thruster (LGIT) installed in the LVTF.

lgit_firing.jpg (7096 bytes)

First firing of the LGIT.

Busek_cluster.jpg (16726 bytes)

A cluster of low-power Hall thrusters to study plume interactions.

double_probe01.jpg (26217 bytes)

Ion thruster discharge plasma characterization:  Photograph taken through the acceleration and screen grid illustrating the double probe positioned in front of the discharge cathode orifice

double_probe02.jpg (15702 bytes)

Ion thruster discharge plasma characterization: Top view looking through window in the anode wall of the double probe positioned at it's closes axial location to the discharge cathode assembly.

173M_first_run_500V_10A.jpg (65489 bytes)

NASA-173M V.1 when it was first operated at 500 V, 10 A.

ba.jpg (58477 bytes)

Alec inspects the Hall thruster

Bdot_in_P5.jpg (35075 bytes)

B-dot probe positioned in the P5 Hall thruster for use with the HARP (high-speed table)

bdot_map.jpg (77220 bytes)

Area mapped of the P5 Hall thruster with the B-dot probe in the discharge chamber.

Busek_cathode.jpg (40924 bytes)

Busek cathode for use in the discharge chamber of the NASA-173GT Hybrid Hall/Ion Thruster.

Cathode_Probe.jpg (32404 bytes)

Probing a hollow cathode with a Langmuir probe (Thermographic image).

harp.jpg (34354 bytes)

High-Speed Axial Reciprocating Probe Positioning System (HARP)

harp02.jpg (29722 bytes)

High-Speed Axial Reciprocating Probe Positioning System (HARP)

lvtf_install_cryos_01.jpg (37693 bytes)

Installing the cryopumps on the LVTF.

lvtf_install_cryos_02.jpg (34827 bytes)

Installing the cryopumps on the LVTF.

P5_solid_model.jpg (51390 bytes)

Solid model of the P5 Hall thruster used for magnetostatic numerical analyses.

P5-2_Studio.jpg (25159 bytes)

NASA-173M V.1 before the outer front pole was plasma coated and with LaB6 intermediate electrode for two-stage operation.

P5_173_in_LVTF.jpg (50152 bytes)

P5 and the NASA-173M mounted simultaneously in the LVTF.

collfp01.jpg (86221 bytes)

Faraday probe experiment in the LVTF.

collfp02.jpg (84341 bytes)

Faraday probe experiment in the LVTF.

collfp03.jpg (94062 bytes)

Faraday probe experiment in the LVTF.

collfp05.jpg (21783 bytes)

Faraday probe experiment in the LVTF.

collfp07.jpg (21519 bytes)

Faraday probe experiment in the LVTF.

collfp08.jpg (21372 bytes)

Faraday probe experiment in the LVTF.

collfp09.jpg (92556 bytes)

Faraday probe experiment in the LVTF.

FP_precision_align.jpg (20251 bytes)

Precision alignment method for Faraday probe (yes, we're joking).

P5_April_2001.jpg (56575 bytes)

Front-view of the P5 Hall thruster

p5_fp_01.jpg (74307 bytes)

Faraday probe experiment with the NASA-173M V.1 testing GRC and JPL nude probes.  A mechanical jig is used for alignment.

p5_fp_02.jpg (80680 bytes)

Faraday probe experiment with the NASA-173M V.1 testing GRC and JPL nude probes.  A mechanical jig is used for alignment.

p5_harp.jpg (20937 bytes)

HARP installed for probing the P5 Hall thruster.

P5_June_2000.jpg (24780 bytes)

P5 Hall thruster in June 2000 after several hundred hours of operation.

p5perf01.jpg (46098 bytes)

First installation of the P5 Hall thruster in the LVTF on the thrust stand.

p5perf02.jpg (75971 bytes)

First installation of the P5 Hall thruster in the LVTF on the thrust stand.

p5perf03.jpg (61910 bytes)

First installation of the P5 Hall thruster in the LVTF on the thrust stand.

p5perf04.jpg (75962 bytes)

First installation of the P5 Hall thruster in the LVTF on the thrust stand.

p5perf05.jpg (40496 bytes)

First installation of the P5 Hall thruster in the LVTF on the thrust stand.  A NASA hollow cathode was used.

p5perf08.jpg (44085 bytes)

First installation of the P5 Hall thruster in the LVTF on the thrust stand.  A NASA hollow cathode was used.

p5perf09.jpg (67556 bytes)

First installation of the P5 Hall thruster in the LVTF on the thrust stand.

 

2 clustered P5 Hall thrusters running at 500 V and 10 A each

The FMT2 and LM4 side by side

 
 


Copyright © 2002, University of Michigan
Contact the PEPL Director or the Webmaster.
Last Revised: 04/23/04 04:57 PM
URL: